Here is a deck with a huge drop to the uneven ground below. The original deck was half the size. The challenge was to create a level guardrail while the new and original decks did not line up. the solution was to fabricate custom-height posts all along the length of the deck, hiding the undulations of the deck which otherwise would have been translated to the top rail – very unsightly.
![](https://apexrailings.com/wp-content/uploads/2023/02/IMG_2604-1024x768.jpeg)
![](https://apexrailings.com/wp-content/uploads/2023/02/IMG_2608-1024x768.jpeg)
![](https://apexrailings.com/wp-content/uploads/2023/02/IMG_2609-1024x768.jpeg)
![](https://apexrailings.com/wp-content/uploads/2023/02/IMG_2612-1024x768.jpeg)
![](https://apexrailings.com/wp-content/uploads/2023/02/IMG_2615-1024x768.jpeg)
Posted in Featured Projects